Bath projects 6 3 from a bar. Determining the dimensions of individual rooms

The cost of building a log cabin bath 6x3 without finishing under the roof - 216,000 rubles

  • The foundation is columnar. 2 blocks in a pedestal (for one-story houses) and 4 blocks in a pedestal on a cement screed (for houses with an attic). Concrete blocks, full-bodied, 200x200x400 mm in size. Pedestals are installed on a compacted sand cushion. Sand (PGS) is provided by the customer.
  • External walls - profiled beam of natural humidity with a section of 145x90 mm (wall thickness - 90mm) Profile "block house" or straight.
  • In total, there are 16 crowns in the log cabin of one-story baths. There are 17 crowns in the log house of baths with an attic.
  • An open terrace (if any) on supports made of planed timber with a section of 100 * 150 mm, with shrink jacks. Fencing - a handrail from a planed bar with a section of 40 * 100 mm. Steps at the entrance.
  • The height of the ceiling of the first floor in cleanliness (from the floor log to the floor beam) for one-story baths is 2.15 m (+/-50mm); for saunas with an attic 2.29m (+/- 50mm)
  • The second floor is an attic. Clear attic ceiling height (from floor beam to ceiling beam) - 2.25 m
  • The height of the roof in the ridge for one-story baths is 1.20 m.
  • The pediments are a frame made of boards of natural humidity with a section of 150 * 40 mm, 100 * 40 mm. External finishing of pediments - lining (spruce / pine AB) 17 * 90 mm. Wind protection - NANOIZOL "A" (for buildings with an attic).
  • In the pediments of one-story buildings, a door (1 pc.) And ventilation hatches (1 pc. For each pediment, under the ridge) are installed.
  • Ventilation hatches are installed in the gables of buildings with an attic (3 pieces for each gable).
  • Eaves and roof overhangs 200 mm wide (for one-story buildings) and 300 mm (for buildings with an attic). Cornices and overhangs are hemmed with clapboard (spruce / pine AB) 17 * 90 mm.
  • The device of window and door openings with a dressing crown, without the installation of casing bars.
  • Assembly of the house / bath at the customer's site.

The price of a 6x3 turnkey bath with a foundation and a stove is 338,000 rubles

  • The foundation is columnar. 2 blocks in a pedestal (for one-story baths) and 4 blocks in a pedestal on a cement screed (for baths with an attic). Concrete blocks, full-bodied, 200x200x400 mm in size. Pedestals are installed on a compacted sand cushion. Sand (PGS) is provided by the customer.
  • Waterproofing - roofing material in one layer.
  • Strapping - a bar of natural moisture with a section of 150x100 mm. On the outer perimeter, the strapping is laid in two rows. The bar is treated with a protective composition.
  • Floor logs - a board of natural moisture with a section of 40x150 mm per edge, with a step of 600 mm.
  • Draft floor - a board of natural humidity with a section of 22x100mm. Steam, waterproofing - NANOIZOL S.
  • Floor insulation - 100mm KNAUF/URSA mineral wool (or equivalent). Vapor barrier - NANOIZOL V.
  • The finished floor of the first floor is a dry tongue-and-groove floorboard (spruce/pine AB) 36mm thick. Each fifth board is fastened with screws (for the possibility of further flooring).
  • External walls - profiled beam of natural humidity with a section of 145x90 mm (wall thickness - 90mm) Profile "block house" or straight. There are 16 crowns in total (for one-story baths) and 17 crowns (for baths with an attic).
  • Partitions of the first floor - profiled beam of natural humidity with a section of 145x90 mm, straight profile. They cut into external walls with a depth of up to 30mm.
  • Mezhventsovy insulation - jute cloth 6 mm thick
  • Interconnection - on a metal dowel (building nail 6x200mm, 250mm).
  • Corner connection - "in half a tree." The outer corners of the log house are sewn up with clapboard (spruce / pine AB) 17 * 90 mm in two rows.
  • An open terrace (if any) on supports made of planed timber with a section of 100 * 150 mm, with shrink jacks. Fencing - a handrail from a planed bar with a section of 40 * 100 mm filled with carved balusters. Steps at the entrance.
  • Terrace floors - dry tongue-and-groove floorboard (spruce/pine AB) 36mm thick. Fasten with self-tapping screws to each board. Boards are laid in 5 mm increments.
  • Terrace ceilings - lining (spruce / pine AB) 17 * 90 mm. Vapor barrier - NANOIZOL V.
  • The ceiling height of the first floor in cleanliness (from floor to ceiling) is 2.10 m (+/- 50mm) - for one-story baths and 2.25 m (+/-50mm) - for baths with an attic.
  • The filing of the ceiling of the first floor (except for the steam room) - lining (spruce / pine AB) 12.8 * 88 mm. (joint for layout is allowed)
  • The second floor is an attic. Clear attic ceiling height (from floor to ceiling) - 2.20 m
  • Floor insulation - 100 mm KNAUF / URSA mineral wool (or equivalent). Vapor barrier NANOIZOL V.
  • Attic floors - dry tongue-and-groove floorboard (spruce / pine AB) 36mm thick. Each fifth board is fastened with screws (for the possibility of further flooring).
  • Sheathing of the walls and ceiling of the attic - lining (spruce / pine AB) 12.5 * 88 mm (a joint for layout is allowed).
  • Attic wall insulation - 100mm ROCKWOOL basalt mats (or equivalent). Vapor barrier - NANOIZOL V.
  • Partitions of the attic - a frame made of a bar of natural moisture with a section of 40 * 75 mm, sheathed on both sides with clapboard (spruce / pine AB) 12.5 * 88 mm. Partitions are not insulated.
  • Rafters - farms from a board of natural humidity with a section of 150x40mm., 100x40mm. Are established with a step of 900-1000 mm.
  • The pediments are a frame made of boards of natural humidity with a section of 150 * 40 mm, 100 * 40 mm. External finishing of pediments - lining (spruce / pine AB) 17 * 90 mm. . Wind, moisture protection - NANOIZOL "A" (for baths with an attic).
  • In the pediments of one-story baths, a door (1 pc.) And ventilation hatches (1 pc. For each pediment, under the ridge) are installed.
  • Ventilation hatches are installed in the gables of baths with an attic (3 pieces for each gable).
  • Lathing - a board of natural moisture with a section of 22 * ​​100 mm, with a step of 300 mm. Counter-lattice - rail 20 * 40 mm, along the slopes of the rafters.
  • Roofing - ONDULIN (burgundy, brown, green) or galvanized corrugated board. Underroofing vapor barrier - NANOIZOL S.
  • Cornices and roof overhangs 200 mm wide (for one-story baths) and 300 mm (for baths with an attic). Cornices and overhangs are hemmed with clapboard (spruce / pine AB) 17 * 90 mm.
  • The staircase to the attic is single-flight, on bowstrings made of planed timber with a section of 145 * 90 mm. Floorboard steps. The handrail and the fence in the attic are a planed bar with a section of 40 * 100 mm.
  • Finishing the walls and ceiling of the steam room - lining (aspen B) 14 * 90 mm (a joint for layout is allowed). Reflective insulation on a foil basis - NANOIZOL FB. Counter rail - 10 * 40 mm (ventilation gap - 10 mm). Before sheathing, the timber base of the walls is treated with a protective composition for baths and saunas NEOMID 200.
  • Two-tier shelves made of planed board (aspen B) 28*90 mm. The width of the step - 40 cm (height - 50 cm); lounger width - 60 cm (height - 110 cm).
  • Installation of the ERMAK 12 / ERMAK 16 furnace with a hanging tank (stainless steel 35 l) for heating water.
  • The basis of the furnace - a brick in one row. Cutting furnace portal - brick.
  • Fire insulation - basalt cardboard, ceiling and roof passages, a reflective screen made of smooth galvanized steel on basalt cardboard, inflow sheet.
  • The flue - vertical, with an output in a roof through a ceiling. Starting pipe - stainless steel 0.5 mm, stainless steel gate valve, stainless steel starting adapter, sandwich pipes 115 * 200 mm (stainless steel 0.5 mm * galvanized 0.5 mm), galvanized head.
  • Installation in the washing shower tray 800 * 800 mm with a siphon. The outlet of the drain outside the perimeter of the bath is a sanitary PVC pipe with a diameter of 50 mm.
  • Windows - wooden, double-glazed, with a seal and fittings (screw hinges, twist locks). Inward-opening doors. Dimensions (h*w) 1200*1500 mm; 1200*1000 m; 1200*600mm; 600*600mm; 400*400 mm. Windows are installed in casing boxes.
  • Entrance door - wooden, paneled, deaf (spruce / pine A). Size (h * w) 1800 * 800 mm (for one-story baths; 2000 * 800 mm (for baths with an attic). Handles, hinges. A padlock is installed on the front door.
  • Doors interroom - bath, frame (aspen A). Size (h*w) 1750*750 mm. Handles, hinges.
  • Casing bars (swarms) are installed in window and door openings.
  • Sealing of corners, joints, junctions - plinth spruce / pine A / aspen AB.
  • Finishing of windows, doors - architraves spruce / pine A on both sides, aspen AB
  • Nails for fixing parts - construction black.
  • Nails for fastening lining - galvanized 2.5x50 mm
  • Nails for fastening the plinth, layouts - finishing galvanized 1.8x50 mm.
  • Loading, delivery up to 400 km from Pestovo, Novgorod region, unloading of a set of material.
  • Assembly of the bath at the customer's site.
  • BONUS. Steam room accessories. Stones - gabbro-diabase 40 kg.

We have compiled for you a convenient table of differences in the configuration of baths for shrinkage and turnkey.

COSTRUCTION

SHRINK

FULL CONSTRUCTION

Columnar foundation of concrete blocks 200*200*400

Yes

Yes

Double strapping from a bar 150 * 100 mm

Yes

Yes

Floor logs from a board 40 * 150 on the edge with a step of 600 mm

Yes

Yes

Draft floor from a board 22*100/150 mm

No

Yes

Floor insulation with hydro and vapor barrier

No

Yes

Finished floor - dry tongue-and-groove floorboard 36 mm

No

Yes

Walls and partitions made of profiled timber of natural humidity with a section of 145 * 90 mm (wall thickness - 90 mm)

Yes

Yes

Assembling a log house on steel dowels

Yes

Yes

Corner connection - in half a tree

Yes

Yes

Mezhventsovy heater - jute

Yes

Yes

Rafters - trusses from a bar 40 * 100/150 mm with a pitch of 900/1000 mm

Yes

Yes

Lathing - board 20*100/150 mm

Yes

Yes

Roofing - ondulin / galvanized corrugated board C20

Yes

Yes

Roof eaves and overhangs are hemmed with clapboard spruce / pine AB

Yes

Yes

Window and door openings with dressing crown, without installation of casing bars

Yes

No

Window and door openings with installation of casing bars

No

Yes

Installation of windows and doors

No

Yes

Ceiling filing - lining spruce / pine AB

No

Yes

Insulation + vapor barrier of floors / attic

No

Yes

Finishing the walls and ceiling of the attic - lining spruce / pine AB

No

Yes

Finishing the walls and ceiling of the steam room - lining aspen AB + shelves

No

Yes

Furnace and chimney installation

No

Yes

Installation in the washing shower tray 800 * 800 mm with a siphon. Conclusion of the drain for the perimeter of the bath

No

Yes

Staircase to the attic

No

Yes

Finishing: plinth, platbands

No

Yes

Loading a set of material, its delivery up to 400 km from our base, unloading at the customer's site

Yes

Yes

Name

Cost, rub)

unit of measurement

Foundation installation on screw piles or reinforced concrete foundation

8-921-930-69-80,
8-926-742-95-01

Decorative finish of the plinth - pick-up ()

1000-1600

running meters

Installation of reinforced concrete slabs 500 * 500 * 100 mm under the supporting pedestals ( )

PC.

Protection (lining board) of the first row of strapping from a larch board 50 * 150 mm ( )

running meters

Protection (lining board) of the first row of strapping made of larch board 50 * 200 mm ( )

running meters

Double strapping from timber 150x150mm

running meters

Double strapping from timber 150x200mm

running meters

Device floor log from a bar 150x100mm

running meters

Installation of floors from a larch terrace board "velveteen" (for open terraces) ()

2000

m*2 floor

Installation of finishing floors made of tongue-and-groove larch floorboard 27 mm ( )

2000

m*2 floor

External walls made of profiled timber with a moisture content of 145x140mm, partitions made of profiled timber. humidity section 145*90 mm

2500

running meters exterior walls

External walls and partitions made of profiled chamber-drying timber with a section of 145x90 mm

2300

running meters exterior walls

And baffles

External walls made of profiled kiln-dried timber with a section of 145x140 mm, partitions made of profiled kiln-dried timber with a section of 145x90 mm

4000

linear meters of external walls

Exterior walls made of profiled timber. humidity with a section of 145x190mm, partitions made of profiled timber eat. humidity section 145*90 mm

4500

linear meters of external walls

External walls made of profiled chamber-drying timber with a section of 145x190mm, partitions made of profiled chamber-drying timber with a section of 145*90mm.

5300

linear meters of external walls

A set of kiln-dried lumber ( )

1000

m * 2 building area

Conjugation of crowns on a wooden dowel

1000

Assembling a log house using a SPRING ASSEMBLY FORCE ( )

2000

running meters external walls and partition walls

Assembling a log house with a screed of crowns in height with steel studs

1500

running meters external walls and partition walls

Corner connection "groove-thorn" (warm corner)

6000

one corner of the log

Corner connection “in the bowl” ( )

from 30 000

house kit

Interventional insulation - holofiber()

300/450/600

linear meter of the outer walls of the log house

Increasing the ceiling height by 14 cm (+ one crown in the log house)

500/750/1000

running meters exterior walls

and partition walls

Insulation 150mm

m * 2 insulated area

The device of a ladder on a bowstring made of glued laminated timber, with wide steps, turned pillars, balusters and a figured handrail.

25000

PC.

Roofing - metal tiles RAL 3005 ,5005,6005,7004, 7024,8017)

m*2 roof

Roofing - polymer-coated corrugated board(RAL 3005,5005,6005,7004, 7024,8017)

m*2 roof

Installation of a drainage system (PVC, DEKE)

1200

running meters roof slope

Installation of corner snow barriers ( )

running meters roof slope

Installation of tubular snow barriers ( )

1300

running meters roof slope

Attic device: sparse flooring from edged boards along the ceiling beams, a door in one of the gables + a dormer window in the opposite gable

m*2 ceiling

External finishing of pediments - block house spruce / pine AB 28 * 140

m * 2 gable area

External finishing of gables - imitation of timber 18*140 mm

m * 2 gable area

Treatment of the entire building with a fire-retardant composition NEOMID ( )

m * 2 building area

Surface treatment with NEOMID terrace oil ( )

m*2 floor

Treatment of the walls and ceiling of the steam room and washing varnish NEOMID "for baths and saunas" ( )

m * 2 walls and ceiling

Processing the ends of the log house with NEOMID TOR PLUS ( )

opening/corner

Treatment of shelves in the steam room with NEOMID oil ( )

1000

m*2 shelf

Finishing of walls and ceiling with larch lining 14*90mm ( )

1500

m * 2 walls and ceiling

The device of the "flowing floor" in the washing ( )

5000

m*2 floor

Finishing with a pair of clapboards OSINA A, including shelves - OSINA A

m * 2 walls and ceiling

Finishing with a double clapboard LIPA A, including shelves - LIPA A

1200

m * 2 walls and ceiling

Finishing with double clapboard LIPA EXTRA, including shelves - LIPA Extra more more)

35 000

PC.

Installation of PVC windows with single-chamber double-glazed windows

from 4000

PC.

Installation of PVC windows with double-glazed windows

from 5000

PC.

Installation of a heat exchanger in the ERMAK furnace, installation of an external tank (stainless steel 60l) on the washing wall, supply hot water metal-plastic pipes

20000

PC.

Installation of a tank (stainless steel 50l) on a pipe above the stove, with a tap outlet to the washing room

13 000

PC.

Installation of another ERMAK oven (

12 000/16000

set

Chimney device made of stainless steel 0.8 mm thick (protective screen, stainless steel inlet sheet included)

16 000/20000

set

Delivery over 400 km from Pestovo, Novgorod region.

km

Construction change house 2.0 * 3.0 / 4.0 m ()

from 21 000

PC.

The whole country rests on such workers

Alexey Gennadievich!!! Due to the lack of time, I could not write to you in any way - many thanks for the work of your employees in the construction of the bathhouse, two young men, unfortunately, I don’t know their names, they worked clearly and harmoniously, the quality of the bathhouse is EXCELLENT !!! The whole country rests on such workers. All friends and relatives also noted the impeccable work of the guys, as a result of which they dreamed of a bathhouse.

The guys built us an amazing bath

I want to express my deep gratitude to Alexey (general director), Zorin Sergey and Chistyakov Vladimir (builders)! In early August, the guys built us an amazing bathhouse, taking into account all our wishes. The delivery of materials was made on time, the construction was completed even ahead of the time agreed earlier, the quality of materials and work was at the highest level. In general, just a fairy tale! I advise you to build only with Russian carpenters!

"Price quality"

The work is pleasing to the eye. Fast, high quality, on time. I thank the team of guys (Evgeny, Dmitry, Sergey) and the general director Alexei Roslov for the work done. I ordered a bathhouse with an attic 6x6 project B-20 with minor changes, “for shrinkage”. All work was completed ahead of schedule and with high quality. All my wishes were taken into account. I was very pleased with Alexey Roslov's attitude to his work. He always promptly and competently answered all my questions, settled controversial issues. The team, despite the young age of the guys, worked quickly and smoothly, at the end they gave advice on caring for the timber and conservation for the winter. Next year I will do the finishing with the same team. "Russian Plotniki" wins in all positions in comparison with other large companies. “Price-quality” is about them. Thanks again. I will recommend to everyone.

Almost every dacha owner dreams of building a bathhouse in his backyard or country house. However, in practice, everything is not so simple, and in order to build not only a beautiful, but also a functional building, you should take into account many nuances in your work.

In order not to break firewood during construction, any undertaking must be preceded by a carefully drawn up project. We will talk about how to develop a 3x6 bath project from a bar in this article.

About wooden baths

Bath buildings made of logs are traditional in Rus'. The tree is not only environmentally friendly and has an attractive appearance, but also creates a unique flavor characteristic of truly Russian baths, which brick counterparts cannot boast of. A reasonable price and the relative ease of construction attract a large number of home craftsmen to wooden baths.

Over the centuries of practice in bath construction, their own traditions have arisen regarding the size and layout of the building, the design of the heater and other nuances. And before you plan anything, you need to have a detailed building plan on hand.

We draw a plan

Ideally, it is desirable to create an individual building plan that would take into account all the features of the site.

If you have no experience in this matter, you can do the following:

  1. Take a ready-made plan that best suits your requirements.
  2. Redo the finished plan, taking into account the features of the site.

Ideally, the bath building has dimensions of 6 by 6 meters. This is enough to accommodate everything you need here. But most sites do not have free space to accommodate such a large building. And the most reasonable way out of the situation is a 3x6 bath from a bar.

Such a building will be half the size of a traditional one. And your task is to make sure that the reduced dimensions do not affect the functionality.

A good bath should consist of the following rooms:

  1. Dressing room.
  2. Restroom.
  3. Washing.
  4. Steam room.

Naturally, there are layouts of buildings in which there are two or even one room, but still you should not move far from the original.

Layout features

The size of the bath depends on how many people will take bath procedures at the same time.

Advice!
To save space, you can also have a rest room.

Let's look at which layout is best suited for construction, measuring 6 by 3 meters:

  1. It is most convenient to create a linear layout of rooms, when all rooms go one after another. Entering the bath, we find ourselves in a rest room. There should be enough space to place a wardrobe, a place to store firewood and a table with chairs for relaxing between visits to the steam room.

Advice!
It is most convenient to load firewood into the sauna heater. The door should be next to the storage area for firewood.

  1. At the left wall of the rest room there is a long narrow corridor with entrances to the steam room and washing room. The steam room is the main room in the bath. There is a stove-heater, and benches for taking bath procedures.
    The washing room is designed for taking a contrast shower between visits to the steam room. Here, which can be either in the form of a wooden, plastic or metal container, or in the form of a small pool.

We calculate the size of the rooms

Calculating the size of rooms will help determine the following instructions:

  1. For a steam room, it is necessary to provide for 2-3 m2 for each visitor.
  2. The rest room is calculated about 3 m2 per visitor.
  3. If you are interested in a do-it-yourself bath from a 6x3 timber, then you can save on the size of the washing room. It is enough for one person to fit here, and for this a room of 2 by 2 meters is enough.

Choosing a material

Bath 6 to 3 from a bar can include the following types of building materials:

  1. Ordinary bar. The simplest and cheapest option. Most often it is delivered to the construction site unpolished and not completely dried.
  2. Glued beam. Very strong and durable material. Usually such bars are glued together from three parts, and have excellent technical characteristics.
  3. Profiled bar. The most convenient material in installation. Due to their profiled base, these bars are easily adjusted to each other without forming gaps.

The most expensive option is profiled laminated timber - a very durable and easy-to-use material.

Choosing a foundation

A do-it-yourself 3x6 meter log bath may involve the following types of foundation:

  1. Columnar. Today it is very popular in the construction of baths. It consists of pillars, which are connected from above with a grillage. The main advantages: simplicity and speed of arrangement, low cost. Disadvantages: low bearing capacity, impossibility of installation on unstable soils.

  1. Tape. It is a universal type of bases. It is poured under both massive and light wooden buildings. Allows the arrangement of the basement.

Conclusion

In this article, we figured out how to properly create a bath building project. As you can see, there are a large number of nuances that should be taken into account even at the initial planning stage, otherwise you will not be able to build a bath that would meet all the requirements.

In addition to the plan, the project must also take into account the features of the material and foundation. If the stages of preparation and calculations are thorough and thoughtful, then you can build a high-quality bath. The video in this article contains a lot of additional information on this topic.

Not every land owner can boast of a sufficiently large area of ​​their possessions. Most of them have to place all the necessary buildings on a small piece of land - a gazebo, a house, utility rooms, and still leave room for a garden.

But what is a house without a bath? Is it possible to imagine a suburban building without a favorite place for many to relax? Of course not.

But what about when the area of ​​​​the site does not allow you to build a full-fledged bath? Projects of baths made of 3 by 6 timber will come to your aid in this. Thanks to them, you can easily put on your site, even if it is narrow, a structure for taking bath procedures and physical relaxation.

Of course, it is impossible to call a bath with dimensions of 3 by 6 too spacious, but nevertheless, all rooms can be equipped in it. In such a structure, there will be enough space to accommodate the necessary equipment and supplies that you cannot do without.

In order for a real hospitable host to feel pride in his building, and so that she can provide a comfortable stay for a small group of friends in it, you must choose the right project.

Below we will give you a few examples of 3 by 6 bath projects, from which you can choose the best option for yourself. By the way, if the area of ​​\u200b\u200bthe land allows you, then you can consider the project of a 6x8 bath from a bar. Examples of these projects can be found on our website.

The best option for a 6x3 bath project from a bar

A 6 by 3 wooden building from the side will resemble a well-maintained wooden house. In this room, the incomparable smell of wood will create an atmosphere of calm and comfort.

As shown in the project below, there are 4 rooms in this building:

  • rest room;
  • dressing room;
  • steam room;
  • washing.

And if you place wooden furniture, a couple of armchairs, a sofa and a table in such a bath, as well as install a home theater and a TV, you can not only ensure a comfortable stay in such a bath, but also create all the conditions for a good rest.

Note!
The tree can retain heat to a sufficient extent, and for a very long time and does not let moisture through.
But what if you erect a structure on your site from conifers tree with medicinal properties?
So you will build not only a durable bath, which even after ten years will fully function, but also one that will have a beneficial effect on your health.

This structure includes:

  1. foundation. In this case, it will be of a columnar type, and will consist of cement blocks with dimensions of 200 by 200 by 400 mm. You need to install them under the main reference points of your structure after 1.5 m;
  2. bath base. The first row consists of an unplaned beam with dimensions of 150 by 150. A log is provided on the floor, also from an unplaned beam with dimensions of 150 by 100. They need to be laid in increments of 70 cm;

  1. walls. The walls of such a structure are erected from profiled beams with a linen lining between them. During installation, galvanized nails will be used for interior decoration. In the washing and rest room, the walls may not be sheathed.
  2. partitions. For their arrangement, a profiled beam with dimensions of 90 by 140 mm is used;

  1. ceiling. In the rest room and hemmed with clapboard made of coniferous wood. And also carried out vapor barrier with the help of special materials and insulation;
  2. steam room. In this room, the ceiling and walls must be laid with foil and finished with clapboard of coniferous wood. And also in the steam room there is a threshold made of planed boards;
  3. pallet. The washing room provides for a pallet with a drain device;
  4. bath oven. It is not included in the project package;

  1. rafters. For these purposes, a bar is used every 80 cm with dimensions of 100 by 40 mm.

Note!
A building with such a small size will heat up quickly enough and keep warm inside for a long time.
Since the instructions for arranging such a bath provide for good thermal insulation.

Projects of baths 6 by 3 from a bar can be adjusted according to your wishes, respectively, the price of a new order will differ slightly from the base cost. You can build a structure with such small dimensions in just a week, after which you can enjoy water procedures in your own bath for a long time.

Economical bath project 6 by 3

A cozy and compact bath is considered the best installation option on a plot of land with a small size. Due to the lack of free meters in the suburban area, all more people they began to choose a 3x6 bath project from a bar with an elongated structure.

Despite such a small size of the bath complex, you can be completely sure that a couple of people can easily fit in it.

Based on the above proposed project, you see that this building will consist of three rooms:

  • washing;
  • steam rooms;
  • and rest rooms, which will be located in a row.

So that even with a relatively small size of the washing room, you can easily place a hot tub there, and in. In addition, depending on your requirements, such a project provides for a reduction in the size of the steam room in favor of increasing the area of ​​​​the rest room.

The basic set of such a building includes:

  • material for walls in the form of planed profiled timber with dimensions of 100 by 150 mm and either 150 by 150 mm or 200 by 150 mm - for partitions;
  • paneled doors and;
  • soft wavy roofing is used as a roof;
  • as interfloor floors, a beam with a section of 150 by 100 mm will be used, and the step of the beams is provided for at 70 mm;
  • grooved planed board with a thickness of 35 mm is used as a finishing floor;

  • for sheathing the steam room, a lining made of coniferous wood with a foil gasket is provided;
  • the foundation is provided columnar of concrete blocks with dimensions of 400 by 400 by 400 mm.

Even despite the small size that a 6 by 3 bath has, if you build it yourself, it will still look good both on the river bank or near the lake, and in the forest and in the countryside.

Output

Now you know what projects of baths from a bar with dimensions of 6 by 3 exist. You can learn more about this topic from the video in this article.

In Rus', they always liked to bathe in the bath. Time runs but tastes don't change. Almost every owner of a summer house or a country house dreams of a bath, but not everyone decides to build one. This article will tell you how to make your dream come true by making the design and construction process less complicated.

Bath project 6x3 meters

A bath of this size is 16.8 square meters. m. of usable area, 21.8 - total area, 23.2 - building area for the foundation. It can accommodate four people at the same time. This is quite enough for a family or a small group of friends. Bath 3x6 meters consists of a steam room, shower room, rest room and vestibule (waiting room).

The building is divided into three sectors, 2 m each. There is a steam room on the right, a shower room in the center, and a rest room on the left. The shower room is divided into two parts, 1/3 of its area is given under the vestibule. At the entrance to the premises, a porch with a visor is erected to protect from the sun and rain. There are other options: sometimes a bath is 6 by 3 meters, lined up with a veranda under one roof or combined with a terrace. In the warm season, a person can, leaving the steam room, relax in the fresh air.

Often a bath is made part of a house or a summer kitchen. Such a neighborhood can lead to increased humidity of adjacent buildings. To prevent this from happening, you should carefully consider the waterproofing of the room and the ventilation system.

It is necessary to start construction with the execution of technical documentation, drawing up a project with reference to the site plan. The project includes a construction scheme, designation of water supply, sewerage, ventilation and a list of materials.

building material

You should decide what you will build a bath from, because it should be comfortable, durable, have a pleasant appearance. Most often, timber, brick and various blocks are used. Each of these materials has its own advantages and disadvantages.

In a building made of logs or timber, it can be very comfortable. A pleasant aroma emanates from the walls, they allow air and steam to pass through, and retain heat. Heating costs in such cases are low. The disadvantages include the forced care of the building, without which it will lose its attractiveness under the influence of the external environment.

A brick bath will cost more than a timber option, but it will be more durable and can last up to 150 years. Such buildings have good thermal insulation properties, look great and do not need special care. However, brick buildings are more heat-intensive than wood and have lower steam conductivity. This means that it will take longer to melt such a bath, and you will also need a good ventilation system.

Modern buildings are often built from expanded clay concrete blocks. It is a very durable, lightweight, non-toxic material. It almost does not absorb moisture, has good thermal insulation. One block weighs up to 8 kg, which makes it possible to build independently.

Foam blocks are a light porous material, it can be formed in large blocks, so objects are built very quickly.

Sometimes cinder blocks are used for construction. They have good thermal insulation, weigh a little, and are easy to work with.

Foundation and walls

If the bath project has already been drawn up, the drawings have been approved, and the materials have been selected, they begin to build the foundation on the prepared flat area. It is lowered to the level of soil freezing, given the location ground water. The foundation is built of brick and concrete. It must rise 20 centimeters above the ground in order to wooden walls didn't rot. After a few months, when everything dries well, you can start building.

Before erecting walls, it is necessary to lay waterproofing(treat the foundation with mastic or put roofing material). Then, mounting foam is applied to the waterproofing along the contour of the future walls and the first row of timber is fixed. During this period, you need to be especially careful, because how smooth the walls will be depends on the first crown. The beam is impregnated with an antibacterial mixture even before the construction of the bath. Then they build the remaining rows of the log house, laying each of them with jute insulation.

Final stage of work

At the final stage of construction, the roof is covered, doors and windows are installed. To build a roof, beams are laid along the last beam of walls. Rafters are attached to them with a distance of one meter. Then a crate is installed under the roofing material. The frame is sheathed with a metal tile or profiled sheet. Plywood is laid under the soft tiles.

It should be remembered that the finished structure from a log house shrinks naturally throughout the year, so many construction works are postponed for this period. A bath made of timber has a slight shrinkage, in which case such a delay is not required for finishing work.

When installing the door frame, it is necessary to use a plumb line to set it relative to the floor and walls as evenly as possible, otherwise the door will not open. It should be left between the wall and the door 80 mm for shrinkage of the structure. The door frame will need to be fixed, and the slots treated with mounting foam.

For a bath 6 by 3 meters, several small windows are provided. After shrinkage of the building, the windows and the door frame are insulated.

Bake

The ideal sauna stove should be safe and do its job well (heat water, stones and heat the air in the steam room). The choice of the furnace itself remains with the customer. It can be a stove-heater, an electric stove or a gas boiler. Saving on buying a stove can cost you more, because cheap Chinese counterparts quickly fail. Also, do not take coal as fuel, it is better to use firewood.

Bath interior

Not only the appearance of the building is important, but also the arrangement of the space inside the premises. High-quality materials help to create a very attractive design.

For interior work, tiles, lining made of natural wood, wicker and beech weaving, material imitating timber are used. You can sheathe the floor, walls and ceiling with wood. In such a room it will be easy to breathe and pleasant to be. To work with lining, a frame is installed and a crate is mounted. It is worth considering that the wood heats up from the high temperature, so a gap is left between the wall and the sheathing, which affects the total area of ​​\u200b\u200bthe room.

Dressing room - a small room in which they change clothes. In this case, it plays the role of a vestibule between the room and the external environment. Here you can place a hanger, a narrow bench or a stool.

In the rest room I install a table, chairs, a bench and even a TV. You will also need a cupboard or cupboard.

The main room in the bath is the steam room. It needs to have good air circulation. The materials for this compartment are selected high-quality and durable. For example, linden has proven itself well. It smells of honey, is easy to install and does not deform. Wood of pine and other coniferous plants in rooms with high temperatures cannot be used, because they emit a sharp specific smell. They can be left to finish the vestibule.

A bath from a bar 6 by 3 is classic version steam room in his suburban area. The bath of this design is small and compact. This option is suitable for family holidays or for fun with friends.

A log bath is durable and holds heat well; on a small terrace, you can equip a recreation area with a barbecue grill.

Characteristics of the material for the bath

A bath can be built from various materials, but timber is the most preferred option. This is due to such factors:

  1. Ease of installation.
  2. No shrinkage.
  3. The ability to keep warm.
  4. Unlike a log house, timber elements are laid on the foundation without pre-assembly.
  5. Affordable building price.

There are 4 main types of bars:

  • unprofiled with a rectangular or square section;
  • profiled solid;
  • glued;
  • beam LVL.

For the construction of a home sauna, the most acceptable is a profiled beam of a solid structure, which has exact dimensions and appropriate processing. This material provides a tight pairing of wood, which facilitates installation and eliminates additional processing of the walls. Shrinkage of buildings made of such material does not exceed 5%.

The first crowns of the bath are best made from hardwood timber. This type of wood rots less in conditions of high humidity.

Starting from the 3rd crown, a log house can be built from coniferous wood: spruce or pine. The natural resins contained in this material contribute to the retention of heat indoors.

Timber material is made of different sections: from 120 x 120 mm to 200 x 200 mm. But the most appropriate for building a house is a timber with dimensions of 150 x 150 mm in longitudinal section. For internal partitions, a beam of 150 x 100 mm will suffice.

Before starting construction, the wood must be treated with antiseptic agents to prevent rotting and the appearance of insects. If there are no special antiseptic fluids, then motor oil can be a great alternative.

Bath project 6x3 from a bar

Figure 1. Layout of a 6x3 bath from a bar.

The layout of the 6 by 3 bath roughly looks like this, as shown in Figure 1. The usable area of ​​\u200b\u200bsuch a building is 16.8 sq.m. The composition of the bath 6 x 3 includes:

  • rest room - dressing room;
  • shower room with shower and toilet;
  • steam room with shelves;
  • hallway;
  • oven-heater.

Almost half of the room is occupied by a rest room, which has a table, TV and benches where they drink tea, and a dressing room to leave clothes.

The steam room is designed for 4 people, it should be spacious enough. The height and length of the room should allow each visitor to freely take a steam bath and relax. A stove-heater is placed in the steam room, which will generate steam.

The entrance to the bath is decorated with a porch with a canopy. This will protect the building from atmospheric precipitation.

A tourniquet is necessarily laid between the crowns of the log house, which will prevent the appearance of cold bridges. The height of the first floor of the bath is 2.25 m. The roof is made of rafters, which are represented by a beam of 50 x 100 mm, and the crate is made of unedged boards of 20 mm.

Roofing material is selected based on the personal preferences of the customer and the scale of material possibilities. Ondulin is best suited.

The floors in the bath are lined according to the technology: subfloor, vapor-waterproofing and insulation. The surface of the finished floor is made of grooved floor boards.

The steam room is finished with a clapboard, which has a foil gasket.

Why do many people prefer a bath with sizes that have already become classic? Advantages of a bath 6 x 3 from a bar:

  • a small sauna can be placed in your suburban area;
  • a cozy room will give a lot of joy to all family members at any time of the year;
  • a bath made of profiled timber retains heat for a long time and at the same time creates good ventilation;
  • coniferous wood when heated will delight visitors with pleasant aromas of healing resins;
  • neat appearance;
  • simple and quick installation of bars.

Building foundations and walls

Before starting the construction of the bath, it is necessary to mark the site. The construction site will be 6 x 3 m, which should be cleared. At this stage, it is necessary to provide for the location drain pit. Next, proceed to the foundation.

Of all the known types of foundations for a bath, it is better to choose strip foundation. This option is simple and quite suitable for such a light structure as a home sauna.

The implementation of the foundation for a bath 6 x 3 consists of the following steps:

  1. Digging a trench according to the marking of the site. The depth of the trench depends on the freezing of the soil. In average climatic conditions, this parameter is 1.2 m. The width of the trench should be 30-40 cm.
  2. At the bottom of the pit, a sand cushion is poured, 10 cm thick and rammed.
  3. Reinforcing cage laying, rod diameter 10 mm.
  4. Formwork device.
  5. Pouring concrete mix.

The foundation should rise 15-20 cm above the ground. If the wooden walls start immediately from the ground, then there will be a high probability of rapid decay of the material.

After a week of concrete pouring begin to erect walls. But first, a layer of waterproofing must be laid on the concrete surface. For this, 2 layers of roofing material or foundation treatment with mastic are suitable.

Next, wooden slats 15 mm thick are laid on the waterproofing along the perimeter, and the space between them is filled with mounting foam. This is necessary so that the first crown can be conveniently attached to the foundation, as well as for additional waterproofing.

So, from the bars 150 x 150 begin laying the first crown. Before installation, the bars must be checked again for dimensional accuracy and treated with antiseptic impregnation. The evenness of the entire structure depends on the quality of laying the first crown.

The first crown is attached to mortgages. But many experts do not recommend using a mount, but leave the structures in a free state, for future shrinkage.

The remaining rows of the log house are laid out on the first crown. Between the crowns of the bath jute insulation is laid. It provides good thermal insulation, prevents the appearance of cold bridges, and also prevents the appearance of mold. Tow or linen is used as a heater.

Between themselves, the crowns are fixed with dowels. These fasteners allow you to save the structure of the house without twisting and drying out the bars. Nails 6 x 200 act as these hardware. Nails are hammered in increments of 1 m to a depth of 25-30 cm.

Final work in the construction of the bath

The door frame is installed on the floor, using a plumb line and a level. If this element is skewed, then the doors will be very difficult to open.

A gap of up to 80 mm should be left between the door frame and the wall for wood shrinkage. Once all dimensions are controlled, the door block is fixed and the gaps are filled with mounting foam.

For a 6 x 3 bath, several small windows are required. Window openings are installed in the same way as in the previous case.

All joints between the boxes and the timber are filled with insulation - tow. But this is done after shrinkage of the log house.

The roof for a bath 6 x 3 has the following algorithm:

  1. Beams are laid along the upper crown.
  2. Rafters are mounted on them with a step of 1 m.
  3. On the rafters, a crate is made for fixing the roofing material. For soft tiles use plywood.

It should be noted that within 1 year a wooden bath gives natural shrinkage, so it is not worth trimming it with facing materials during this period.

It is better to line the dressing room with boards or clapboard made of coniferous wood, and the steam room should be finished with hardwood.

The interior of the bath is best lined with lime boards. This material has a beautiful golden color, and when heated, this wood exudes a honey aroma. Linden boards are very easy to install: they do not split or deform when the temperature changes. Linden pairs are especially useful for people with a diseased liver or a cold.

The most popular option for finishing the bath is lining. It has a beautiful appearance, is easy to install, and is also inexpensive. To equip the lining, it is necessary to build a frame and make a crate. There should be gaps between the walls and the lining, as the wood expands when heated. Given this factor, the use of lining reduces the usable area of ​​​​the room.

A log bath is an environmentally friendly and warm building designed for family holidays outside the city.